Our works

«Agromean» LLP
«Dostyk Cargo Cervice» LLP

We at Konkurent-B are interested in mutually beneficial partnerships. Since its inception, our company has completed the following projects:

  1. June to September 2013 - design and construction of 1350 linear meters of railways with 2 turnouts for TOO “Agromean” (LLP);
  2. September to October 2013 - design and construction of 200 linear meters of railways with 1 turnout for TOO “LEGko” (LLP) / Concrete-Astana.
  3. July to September 2013 - repair of railway tracks for TOO “Stroikonstruktsiya” (LLP);
  4. November 2013 to April 2014 -  Phase 1 design and construction of 7500 linear meters of wide-gauge tracks with 6 turnouts for TOO “Dostyk Cargo Cervice” (LLP); concrete large-capacity platform (10 500 m2);
  5. Mart to May 2014 -  construction of 300 linear meters of railway tracks for TOO “Atasu-Trans” on Zhetysu Station;
  6. Maty to July 2014 - design and construction of 1512 linear meters of railways with 1 turnout for TOO “«Agrimer Astyk»” (LLP) on Kokshetau-1 Station;
  7. July to September 2014 -  full repair of 1350 linear meters of railway tracks and installation of 6 turnouts for TOO “Agrimer” on Yesil Station.
  8. August to September 2014 - full repair of 2300 linear meters of railway tracks for TOO “«GRANART» ” on Zhenyspai Station.
  9. August 2014 till present - construction of a grain-collecting station for TOO “Agromean” on the Beskol Station;
  1. Construction of hangars (4500 sq. m).
  2. Construction of a PAO (1000 sq. m).
  3. Construction of a concrete platform (12 000 sq. m).
  1.  November 2014 - construction start of 3050 linear meters of a narrow-gauge railway tracks and 1 turnout and a derailing tongue on a centralized site for TOO “«Dostyk Cargo Сervice”.
  2.  2013 to 2014 - design of 40 km of railway entry lines in the following regions in Kazakhstan: Akmola; Almaty; Karaganda; Petropavlovsk; Kostanai; Pavlodar and Zhambyl.
  3.  September 2014 to January 2015 - design of 4.4 km of railways; design of electric interlocking and communication for AO (JSC) “KTZ Express” on “Sorokovaya” Station.
  4.  January to April 2015 - plan of the Railway complex of the coal strip mine, “Centralny-2”, for TOO (LLP) SP Arbat with an entry line to the under-construction Shubarkol Station of the main railway line, Shubarkol-Arkalyk (total railroad mileage - 38 km).
  5.  April 2015 - electric interlocking of a turnout for TOO (LLP) Continental Logistics.
  6.  2013-2015 - full repair of 10 km of railway tracks and construction of 20 km of railway tracks.
  7.  2013-2015 - installation of crane runways with cranes with a capacity of 10, 12, 25 and 45, with a total of 6 cranes.
  8.  June 2015 - TOO (LLP) “Zhasylskoe KhPP” at Zhasyl station, Akmola region.
  9.  June 2015 - TOO (LLP) “Irchenko Elevator” at Irchenko Station, Akmola region.
  10.  July 2015 - TOO (LLP) “KhPP Tonkeris” at Tonkeris Station, Akmola region.
  11.  August to September 2015 - design and construction of railways for the logistical center of TOO (LLP) “«Vehicle Processing Astana” at “Sorokovaya” Station.
  12.  September 2015 to January 2016 - design of railway tracks for Transport and logistics center in Aktobe city for TOO “Continental Logistics”.
  13.  April 2017 - rough design of a railway track for the Multifunctional sea terminal “Sarzha” (total mileage - 32 km).
  14. May 2017 - deisgn of a railway switchyard as part of the project of Construction of a ferry complex in the Kuryk Port and operational use of universal freight and passenger ferries.
  15. From June 2017 - design and construction of railway tracks, design and construction of a factory for advanced refining of oil- and grain-crops with the implementation of equipment from the Ocrim company. Factory capacity: 200 t per day.
    ТОО (LLP) “AGRIMERASTYK”
  16. Construction of railway track-Transport and logistics center in Shymkent city.

 

 

Our works